Wednesday, August 22, 2018

SKY- Suryashakti Kisan Yojana

The Gujarat government on Saturday launched a solar power scheme for farmers- Suryashakti Kisan Yojana (SKY) enabling them to generate electricity for their captive consumption as well as sell the surplus power to the grid and earn an extra buck.
Announcing the pilot project of the scheme in Gandhinagar, chief minister Vijay Rupani termed it a revolutionary step towards empowering farmers to generate their own electricity using solar energy and help doubling their income.
As per the scheme, farmers having existing electricity connection will be given solar panels as per their load requirements. The State and Central governments will give 60 per cent subsidy on the cost of project. The farmer is required to take 5 per cent cost, while 35 per cent will be provided to him as an affordable loan with interest rates of 4.5-6 per cent. The scheme duration is 25 years, which is split between 7-year period and 18-year period.
"For the first 7 years, farmers will get per unit rate of Rs 7 (Rs 3.5 by GUVNL + Rs 3.5 by state govt). For the subsequent 18 years they will get the rate of Rs 3.5 for each unit sold," said Saurabh Patel, State Energy Minister.
The move is being seen as an attempt to pacify the farmers, who are reportedly angry with the ruling party.
Below is the link for the media session of Gujarat CM for announcement of Suryashakti Kisan Yojana, click here. To know more about subsidy, read MNRE Rooftop Solar Power Plant Subsidy Scheme.

Wednesday, August 1, 2018

GRIHA: Renewable Energy Utilization- A step towards sustainability

GRIHA is an acronym for Green Rating for Integrated Habitat Assessment. GRIHA Council, is an independent platform (registered as a society) for the interaction on scientific and administrative issues related to sustainable habitats in the Indian context. GRIHA Council, is mandated to promote development of buildings and habitats in India through GRIHA. It was founded by TERI (The Energy and Resources Institute, New Delhi) with support from MNRE (Ministry of New and Renewable Energy, Government of India) along with a handful of experts in the sustainability of built environment from across the country. 

In this blog we will be discussing on Energy section of GRIHA out of may other section which will include points and ways to sffirm them."Renewable Energy Utilization" criterion is a part of Energy section. The purpose of of this criterion is to ensure that building incorporate renewable energy as a source in the project and partially or completely get independent from the conventional source of energy such as coal petroleum etc. By fulfilling the criterion, a project can claim maximum of 7 points.  This criterion contributes 7% of total points.


In order to claim points in this criteria, a project has to meet below mentioned conditions:
  • On-site/Off-site renewable energy system installation to offset a part of the annual energy consumption of internal artificial lighting and HVAC systems as mentioned in the table below: 


Daytime Commercial/ Institutional Buildings

Residential Buildings

24 X 7 occupied buildings

Points
2.5% (only On-site)
-
0.5% (only On-site)
Mandatory
5%
5%
1%
1
10%
10%
3%
2
15%
15%
5%
4
20%
20%
7%
5
25%
25%
10%
7
                                                                             OR
  • Off-site renewable energy system to offset 100% building energy demand (this appraisal is available for only non-residential buildings) – Mandatory +7 points 


If the project is meeting the above mentioned conditions, following documents has to be submitted. The nature of documents can change but the purpose needs to be fulfilled in order to claim points
  • Calculations/simulations for renewable energy system sizing & on-site annual energy generation potential. 
  • Specification sheets and purchase orders (reflecting full quantities) of the renewable energy system, highlighting the panel performance (as tested under standard test conditions). 
  • Drawings in CAD format to show location of renewable energy systems. 
  • Documents supporting off-site generation of energy through renewable energy systems. These may be either: Renewable Energy Certificates (RECs) for at least 2 years along with a declaration that the RECs are not being used for any other obligatory requirements and will be purchased every year OR Power Purchase Agreement from the utility for purchase of green power. In the agreement, the address of the particular site must be mentioned. 
  • Photographs, with description, of the measures implemented.

For more details on green building and its other criterion visit GRIHA website. To download copy of GRIHA manual V 2015, click here


Tuesday, July 3, 2018

Quality Certification and Standards for Grid-connected Rooftop Solar PV Systems


Certification and standardization of PV system components is an on -going process in India. It is essential to the fast growth of the sector, since without product certification and standardization, there will be a lack of confidence in the technology and consequently, a higher risk perception among project debt financiers in the market.

                              Image result for iec norms for solar latest Image result for ieee
The relevant standards and certifications for a grid-connected rooftop solar PV system/plant are given mentioned below:

Certification/Standards
Description
SOLAR PV MODULES/PANELS
IEC 61215/ IS 14286
Design Qualification and Type Approval for Crystalline Silicon Terrestrial Photovoltaic (PV) Modules
IEC 61646/ IS 16077
Design Qualification and Type Approval for Thin-Film Terrestrial Photovoltaic (PV) Modules
IEC 62108
Design Qualification and Type Approval for Concentrator Photovoltaic (CPV) Modules and Assemblies
IEC 61701- As applicable
Salt Mist Corrosion Testing of Photovoltaic (PV) Modules
IEC 61853- Part 1/ IS 16170 : Part 1
Photovoltaic (PV) module performance testing and energy rating –: Irradiance and temperature performance measurements, and power rating
IEC 62716
Photovoltaic (PV) Modules – Ammonia (NH3) Corrosion Testing
IEC 61730-1,2
Photovoltaic (PV) Module Safety Qualification – Part 1: Requirements for Construction, Part 2: Requirements for Testing
IEC 62804 (Draft Specifications)
Photovoltaic (PV) modules - Test methods for the detection of potential-induced degradation (PID). IEC TS 62804-1: Part 1: Crystalline silicon
IEC 62759-1
Photovoltaic (PV) modules – Transportation testing, Part 1: Transportation and shipping of module package units
SOLAR PV INVERTERS
IEC 62109-1, IEC 62109-2
Safety of power converters for use in photovoltaic power systems Safety compliance (Protection degree IP 65 for outdoor mounting, IP 54 for indoor mounting)
IEC/IS 61683 (For stand Alone System)
Photovoltaic Systems – Power conditioners: Procedure for Measuring Efficiency (10%, 25%, 50%, 75% & 90-100% Loading Conditions)
IEC 62891
Overall efficiency of grid-connected photovoltaic inverters *
IEC 62116/ UL 1741/ IEEE 1547
Utility-interconnected Photovoltaic Inverters - Test Procedure of Islanding Prevention Measures
IEC 60255-27
Measuring relays and protection equipment - Part 27: Product safety requiremen
IEC 60068-2 (1, 2, 14, 27, 30 & 64)
Environmental Testing of PV System – Power Conditioners and Inverters
IEC 61000- 2,3,5
Electromagnetic Interference (EMI), and Electromagnetic Compatibility (EMC) testing of PV Inverters (as applicable)
CABLES
IEC 60227/IS 694, IEC 60502/IS 1554 (Part 1 & 2)
General test and measuring method for PVC (Polyvinyl chloride) insulated cables (for working voltages up to and including 1100 V, and UV resistant for outdoor installation)
EARTHING /LIGHTNING
IEC 62561-1
Lightning protection system components (LPSC) - Part 1: Requirements for connection components
IEC 62561-2
Lightning protection system components (LPSC) - Part 2: Requirements for conductors and earth electrodes
IEC 62561-7
Lightning protection system components (LPSC) - Part 7: Requirements for earthing enhancing compounds
ENERGY METER
IS 16444 or as specified by the DISCOMs
AC Static direct connected watt-hour Smart Meter Class 1 and 2 — Specification (with Import & Export/Net energy measurements)
SOLAR PV ROOF MOUNTING STRUCTURE
IS 2062/IS 4759
Material for the structure mounting
JUNCTION BOXES
IEC 60529
Junction boxes and solar panel terminal boxes shall be of the thermo plastic type with IP 65 protection for outdoor use, and IP 54 protection for indoor use
SURGE ARRESTORS
IEC 61643-11:2011 / IS 15086-5 (SPD)

FUSES
IS/IEC 60947 (Part 1, 2 & 3), EN 50521
General safety requirements for connectors, switches, circuit breakers (AC/DC)
IEC 60269-6
Low-voltage fuses - Part 6: Supplementary requirements for fuse-links for the protection of solar photovoltaic energy systems

Thursday, June 28, 2018

An Overview: Solar Power Optimizer

With changing times, technology of solar has also changed. We have seen efficiency of modules growing from 12 to 23 %. With advancing technology in solar module, why should other components lag behind. Welcome a innovative product that has  recently entered into Indian market. This product has already created buzz in US  and is currently dominating US solar sector. Its, Solar Power Optimzer.

Image result for power optimizerA power optimizer is a DC to DC converter technology developed to maximize the energy harvest from solar photovoltaic or wind turbine systems. They do this by individually tuning the performance of the panel or wind turbine through maximum power point tracking, and optionally tuning the output to match the performance of the string inverter.

Presently, SolarEdge is the only distributor of Power Optimizer in India. SolarEdge is a global leading inverter manufacturer with has shipped over 7.5GW of its DC optimized inverter systems shipped, and over 600,000 SolarEdge PV sites monitored in 125 countries around the world. SolarEdge has partnered with India's electrical giant, Havells India Limited. 

Havells  India Limited is a leading US$ 1.3 bn Fast Moving Electrical Goods  (FMEG)  Company  with a market capitalisation US$ 3.3 bn and a major  power distribution equipment manufacturer with a strong global presence in 45Countries. Havells enjoy enviable market dominance across  a  wide spectrum of products, including Industrial & Domestic Circuit  Protection  Devices,  Cables  & Wires, Motors, Fans, Modular Switches,  Home Appliances, Electric Water Heaters, Power Capacitors, CFL   Lamps,  Luminaires  for  Domestic,  Commercial  and  industrial Applications.
                         Image result for solaredge        Image result for havells

By entering Indian market in partnership with Havells India Limited, has created a sense of insecurity for their fellow solar inverter manufacturer because of its advance technology. SolarEdge has entered with their high end products: Solar Power Optimizer, Solar Grid Tied Inverter, Environmental sensors and communication gateways.

Since India is a price conscious market and it takes time to accept new technology, it will be early to decide its growth & sale in Indian Solar market.  Looking at the US market, the efficiency and performance of Power Optimizer is better as comparison to conventional inverter. But the question lies whether this futuristic gadget are pocket friendly or not. Secondly, will they perform equally good in Indian climate condition as it is a bit harsh comparing US. Time will tell about its performance and future of power optimizer in India.

Monday, June 25, 2018

Solar Energy: More Sunny, More Money

Solar Energy, a topic which is receiving close review as compared to any other sectors. And why not, it is not only a fabulous way to reduce the issue of various environmental problems but also a chance for us to balance the overutilized conventional resources. By switching to solar we all are reducing the pressure on our fast depleting resources such as coal, petroleum etc. Here I wouldn't be discussing about already known social and environmental benefits. Here I would be discussing solar energy as a business prospective, I see solar as a fantastic opportunity for business, especially when there is strong support from government in form of subsidy and incentive, it give every individual to monetize solar. From a MNC point of view, its a great way to add some CSR credit under their belt.

The Government of India has appointed Ministry of New And Renewable Energy, commonly called MNRE  as government body to govern Solar Energy sector. Solar energy power plant are considered to be easy to  earn instead of  other renewable sources.There are different models or schemes through which one can generate electricity and sell it. 

1. Power Purchase Agreement:
 It is an agreement between an EPC contractor/ System Integrator and government for 25 years. The government purchase electricity at a fixed tariff decided by competitive bidding. Government releases tender periodically, and system integrator can participate in these tender, offline or on-line.

2. Net Metering:
It is a not necessary that an owner uses all its the electricity generated by the Solar PV system. In order to utilize the maximum from the system, government give opportunity to owner to monetize the unused electricity generated from PV system. For each unit supplied to grid , a certain tariff is provided  OR can be compensate from the next billing cycle. 

Incentive= (Electricity in kWh generated from Solar PV system - Electricity in kWh consumed)* tariff

Net metering policy also helps in lowering to the cost slab which indirectly helps in reducing electricity bill.

The net metering policy differs from state to state. So it is recommended to go through net metering policy before investing.

3. Gross Metering:
It is similar to net metering except in gross metering policy, instead of providing incentive on difference of the electricity unit; incentive is provided on total electricity generated from solar PV system. None of the electricity produced can be utilized by the owner. The policy is applicable in few state only.

4. Third Party Sell:
It is privatized version of power purchase agreement. In this case, the power agreement is made between developer and non-government body( private party) on a mutual tariff and mutual time period. It is generally referred to as RESCO model.

In RESCO model, the initial investment has to be made by developer.Before investing in such model, it is suggested to go through company profile and credit rating. 

5. Captive Usage:
"Money saved is Money earned"
This is mainly applicable for industrial and commercial users. These include, manufacturing plants, cold storage, hotels and retail outlet etc. In the mentioned areas, the consumption is quite high. In order to reduce their monthly bill , it is advisable to install solar system. These sectors are blessed with large area, hence hundreds of kW  of capacity can be easily installed.

6. REC
It stands for Renewable Energy Certificates. It is mandatory for any electricity generating company to resources to generate 2%  through renewable resource and facilitate compliance of renewable power obligation. The government provides an flexibility to them of purchasing REC. The value of 1 REC = 1MWh, this means that person/ company possessing 1 REC has generated 1 MWh units of electricity. Now instead of installing on solar system, one can simply buy REC from other party. The REC once issued shall remain valid for One thousand and ninety-five days from the date of issuance of such Certificate. REC would be exchanged only in the CERC approved power exchanges. For more details on REC,click here.